M1 Metro LineSydney Metro & Trains · TfNSW

M1 Metro Line

TallawongSydenham · M1 Metro Line of the Sydney Metro & Trains.

21
Stations
66 km
Total length
2019
Year opened
~130 min
End-to-end time
Plan a route on this line

21 stations

TallawongTerminus
⬇ UGZ1+0 min
Tallawong area · Tallawong area
6.5 min · 3.3 km
Rouse Hill
⬇ UGZ1+6.5 min
6.5 min · 3.3 km
Kellyville
⬇ UGZ1+13 min
6.5 min · 3.3 km
Bella Vista
⬇ UGZ1+19.5 min
6.5 min · 3.3 km
Norwest
⬇ UGZ1+26 min
6.5 min · 3.3 km
Hills Showground
⬇ UGZ1+32.5 min
6.5 min · 3.3 km
Castle Hill
⬇ UGZ1+39 min
6.5 min · 3.3 km
Cherrybrook
⬇ UGZ1+45.5 min
6.5 min · 3.3 km
Epping
⬇ UGZ1+52 min
6.5 min · 3.3 km
Macquarie University
⬇ UGZ1+58.5 min
6.5 min · 3.3 km
Macquarie Park
⬇ UGZ1+65 min
6.5 min · 3.3 km
North Ryde
⬇ UGZ1+71.5 min
6.5 min · 3.3 km
Chatswood
⬇ UGZ1+78 min
Chatswood · Chatswood · Chatswood
6.5 min · 3.3 km
Crows Nest
⬇ UGZ1+84.5 min
6.5 min · 3.3 km
Victoria Cross
⬇ UGZ1+91 min

About M1 Metro Line

The M1 Metro Line (M1 Metro Line) runs 66 km from Tallawong to Sydenham, serving 21 stations. M1 Metro Line of the Sydney Metro & Trains.

The line opened in 2019. An end-to-end journey takes about 130 minutes. Of the 21 stations, 21 are underground and 0 are elevated, with 3 interchange station(s) connecting to the wider network.

Frequently asked questions