Line 3Guangzhou Metro · GZMTR

Line 3

Airport NorthKecun · Line 3 of the Guangzhou Metro.

14
Stations
28 km
Total length
2005
Year opened
~57 min
End-to-end time
Plan a route on this line

14 stations

Airport NorthTerminus
⬇ UGZ1+0 min
Baiyun Airport T2 · Baiyun Airport T2
4.4 min · 2.1 km
Airport South
⬇ UGZ1+4.4 min
4.4 min · 2.2 km
Renhe
⬇ UGZ1+8.8 min
4.4 min · 2.2 km
Longgui
⬇ UGZ1+13.2 min
4.4 min · 2.2 km
Jiahewanggang
⬇ UGZ1+17.6 min
Jiahewanggang · Jiahewanggang · Jiahewanggang
4.4 min · 2.2 km
Baiyun Avenue North
⬇ UGZ1+22 min
4.4 min · 2.2 km
Tonghe
⬇ UGZ1+26.4 min
4.4 min · 2.2 km
Yongtai
⬇ UGZ1+30.8 min
4.4 min · 2.2 km
Tianhe Coach Terminal
⬇ UGZ1+35.2 min
4.4 min · 2.1 km
Linhexi
⬇ UGZ1+39.6 min
4.4 min · 2.2 km
Tiyu Xilu
⬇ UGZ1+44 min
Tianhe Sports Center · Tianhe Sports Center · Tianhe Sports Center
4.4 min · 2.2 km
Shipaiqiao
⬇ UGZ1+48.4 min
4.4 min · 2.2 km
Gangding
⬇ UGZ1+52.8 min
4.4 min · 2.1 km
KecunTerminus
⬇ UGZ1+57.2 min
Kecun area · Kecun area

About Line 3

The Line 3 (Line 3) runs 28 km from Airport North to Kecun, serving 14 stations. Line 3 of the Guangzhou Metro.

The line opened in 2005. An end-to-end journey takes about 57 minutes. Of the 14 stations, 14 are underground and 0 are elevated, with 2 interchange station(s) connecting to the wider network.

Frequently asked questions

Line 3 at a glance

Line numberLine 3
Stations14
Length28 km
Opened2005-12-26
TypeStandard gauge
Electrification750 V DC third rail / 1.5 kV DC overhead
Daily ridership1,300,000
PhasePhase 1

Plan your journey

Find the best route across all lines

Open route planner