5 stations
Hôtel de Ville–Louis PradelTerminus
⬇ UGZ1+0 min
Hôtel de Ville · Opéra · Hôtel de Ville
1.6 min · 0.6 km
Croix-Paquet
⬇ UGZ1+1.6 min
1.6 min · 0.6 km
Croix-Rousse
⬇ UGZ1+3.2 min
1.6 min · 0.6 km
Hénon
⬇ UGZ1+4.8 min
About Line C
The Line C (Ligne C) runs 2.5 km from Hôtel de Ville–Louis Pradel to Cuire, serving 5 stations. Line C of the Lyon Metro.
The line opened in 1974. An end-to-end journey takes about 6 minutes. Of the 5 stations, 5 are underground and 0 are elevated, with 1 interchange station(s) connecting to the wider network.
Frequently asked questions
Line C at a glance
Line numberLigne C
Stations5
Length2.5 km
Opened1974-12-02
TypeStandard gauge
Electrification750 V DC third rail
Daily ridership60,000
PhasePhase 1
Plan your journey
Find the best route across all lines