16 stations
Tiantongyuan NorthTerminus
⬆ ELZ1+0 min
Tiantongyuan · Tiantongyuan
3.8 min · 1.8 km
Tiantongyuan
⬆ ELZ1+3.8 min
3.8 min · 1.8 km
Lishuiqiao
⬆ ELZ1+7.6 min
3.8 min · 1.8 km
Datunlu East
⬇ UGZ1+11.4 min
3.8 min · 1.8 km
Huixinxijie Nankou
⬇ UGZ1+15.2 min
3.8 min · 1.8 km
Beixinqiao
⬇ UGZ1+22.8 min
3.8 min · 1.8 km
Zhangzizhonglu
⬇ UGZ1+26.6 min
3.8 min · 1.8 km
Dongsi
⬇ UGZ1+30.4 min
3.8 min · 1.8 km
Dengshikou
⬇ UGZ1+34.2 min
3.8 min · 1.8 km
Ciqikou
⬇ UGZ1+45.6 min
3.8 min · 1.8 km
Tiantandongmen
⬇ UGZ1+49.4 min
3.8 min · 1.8 km
Puhuangyu
⬇ UGZ1+53.2 min
About Line 5
The Line 5 (Line 5) runs 27.6 km from Tiantongyuan North to Songjiazhuang, serving 16 stations. Line 5 of the Beijing Subway.
The line opened in 2007. An end-to-end journey takes about 57 minutes. Of the 16 stations, 13 are underground and 3 are elevated, with 3 interchange station(s) connecting to the wider network.
Frequently asked questions
Line 5 at a glance
Line numberLine 5
Stations16
Length27.6 km
Opened2007-10-07
TypeStandard gauge
Electrification750 V DC third rail / 1.5 kV DC overhead
Daily ridership900,000
PhasePhase 1
Plan your journey
Find the best route across all lines