12 stations
XizhimenTerminus
⬇ UGZ1+0 min
Beijing North Railway Station · Beijing North Railway Station · Beijing North Railway Station
7.2 min · 3.7 km
Dazhongsi
⬆ ELZ1+7.2 min
7.2 min · 3.7 km
Zhichunlu
⬆ ELZ1+14.4 min
7.2 min · 3.7 km
Wudaokou
⬆ ELZ1+21.6 min
7.2 min · 3.7 km
Shangdi
⬆ ELZ1+28.8 min
7.2 min · 3.7 km
Xi'erqi
⬆ ELZ1+36 min
7.2 min · 3.7 km
Longze
⬆ ELZ1+43.2 min
7.2 min · 3.7 km
Huilongguan
⬆ ELZ1+50.4 min
7.2 min · 3.7 km
Huoying
⬆ ELZ1+57.6 min
7.2 min · 3.7 km
Beiyuan
⬆ ELZ1+64.8 min
7.2 min · 3.7 km
Wangjing West
⬆ ELZ1+72 min
7.2 min · 3.7 km
DongzhimenTerminus
⬇ UGZ1+79.2 min
Dongzhimen Transport Hub · Dongzhimen Transport Hub · Dongzhimen Transport Hub
About Line 13
The Line 13 (Line 13) runs 40.5 km from Xizhimen to Dongzhimen, serving 12 stations. Line 13 of the Beijing Subway.
The line opened in 2002. An end-to-end journey takes about 79 minutes. Of the 12 stations, 2 are underground and 10 are elevated, with 2 interchange station(s) connecting to the wider network.
Frequently asked questions
Line 13 at a glance
Line numberLine 13
Stations12
Length40.5 km
Opened2002-09-28
TypeStandard gauge
Electrification750 V DC third rail / 1.5 kV DC overhead
Daily ridership650,000
PhasePhase 1
Plan your journey
Find the best route across all lines