18 stations
Dhoby GhautTerminus
⬇ UGZ1+0 min
Plaza Singapura · Plaza Singapura · Plaza Singapura
4.2 min · 2.1 km
Bras Basah
⬇ UGZ1+4.2 min
4.2 min · 2.1 km
Esplanade
⬇ UGZ1+8.4 min
4.2 min · 2.1 km
Nicoll Highway
⬇ UGZ1+16.8 min
4.2 min · 2.0 km
Stadium
⬇ UGZ1+21 min
4.2 min · 2.1 km
Mountbatten
⬇ UGZ1+25.2 min
4.2 min · 2.1 km
Paya Lebar
⬇ UGZ1+29.4 min
Paya Lebar Quarter · Paya Lebar Quarter · Paya Lebar Quarter
4.2 min · 2.1 km
Caldecott
⬇ UGZ1+46.2 min
4.2 min · 2.1 km
Botanic Gardens
⬇ UGZ1+50.4 min
Singapore Botanic Gardens · Singapore Botanic Gardens · Singapore Botanic Gardens
4.2 min · 2.1 km
Holland Village
⬇ UGZ1+54.6 min
About Circle Line
The Circle Line (CCL) runs 35 km from Dhoby Ghaut to HarbourFront, serving 18 stations. Circle Line of the Singapore MRT.
The line opened in 2009. An end-to-end journey takes about 71 minutes. Of the 18 stations, 18 are underground and 0 are elevated, with 9 interchange station(s) connecting to the wider network.
Frequently asked questions
Circle Line at a glance
Line numberCCL
Stations18
Length35 km
Opened2009-05-28
TypeStandard gauge
Electrification750 V DC third rail
Daily ridership500,000
PhasePhase 1
Plan your journey
Find the best route across all lines