NELSingapore MRT · SMRT/SBS

North East Line

HarbourFrontPunggol · North East Line of the Singapore MRT.

14
Stations
20 km
Total length
2003
Year opened
~43 min
End-to-end time
Plan a route on this line

14 stations

HarbourFrontTerminus
⬇ UGZ1+0 min
VivoCity · Sentosa · VivoCity
3.3 min · 1.5 km
Outram Park
⬇ UGZ1+3.3 min
Singapore General Hospital · Singapore General Hospital · Singapore General Hospital
3.3 min · 1.5 km
Chinatown
⬇ UGZ1+6.6 min
Chinatown · Chinatown · Chinatown
3.3 min · 1.5 km
Clarke Quay
⬇ UGZ1+9.9 min
3.3 min · 1.5 km
Dhoby Ghaut
⬇ UGZ1+13.2 min
Plaza Singapura · Plaza Singapura · Plaza Singapura
3.3 min · 1.5 km
Little India
⬇ UGZ1+16.5 min
Little India · Tekka · Little India
3.3 min · 1.5 km
Farrer Park
⬇ UGZ1+19.8 min
3.3 min · 1.5 km
Boon Keng
⬇ UGZ1+23.1 min
3.3 min · 1.5 km
Potong Pasir
⬇ UGZ1+26.4 min
3.3 min · 1.5 km
Serangoon
⬇ UGZ1+29.7 min
NEX · NEX · NEX
3.3 min · 1.5 km
Kovan
⬇ UGZ1+33 min
3.3 min · 1.5 km
Hougang
⬇ UGZ1+36.3 min
3.3 min · 1.5 km
Sengkang
⬇ UGZ1+39.6 min
3.3 min · 1.5 km
PunggolTerminus
⬇ UGZ1+42.9 min
Waterway Point · Waterway Point

About North East Line

The North East Line (NEL) runs 20 km from HarbourFront to Punggol, serving 14 stations. North East Line of the Singapore MRT.

The line opened in 2003. An end-to-end journey takes about 43 minutes. Of the 14 stations, 14 are underground and 0 are elevated, with 6 interchange station(s) connecting to the wider network.

Frequently asked questions

North East Line at a glance

Line numberNEL
Stations14
Length20 km
Opened2003-06-20
TypeStandard gauge
Electrification750 V DC third rail
Daily ridership600,000
PhasePhase 1

Plan your journey

Find the best route across all lines

Open route planner